Cable Electronics DVP14 Spécifications Page 233

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 332
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 232
App5-8 Appendix 5 Ethernet
10BASE2
The following devices are required for 10BASE2 connection:
- Coaxial cable for 10BASE2
- AUI cable
- T-type adaptor
- Terminator for 10BASE2
- Transceiver
- Power supply for the transceiver: 12 VDC
Transceiver
Use the transceiver equipped with the SQE TEST function.
(SQE TEST: Signal Quality Error Test)
Recommended transceiver
* The I/F unit may be broken if the AUI connector is subject to strong force. Use the AUI cable
when connecting the transceiver.
* When the power lamp of the transceiver is not turned on, check the wiring of 12 VDC power
supply, then replace the fuse (refer to page App5-4) of the I/F unit CU-03-2.
For the replacement procedure, refer to the manual “CU-03-2 OPERATING INSTRUCTIONS,”
attached to CU-03-2.
Manufacturer Type
Allied Telesis CentreCOM 107
CU-03
V7
PLC
PLC
Maximum segments: 5
Maximum network distance: 925 m
Maximum network nodes: 100
Ethernet
unit
1 segment (max. 185 m, max. 30 nodes)
AUI cable
(max 50 m)
Transceiver
*2
Terminator
T-type
Node
Node
*1
Repeater
Minimum node
interval
0.5 m
To extend the segment distance or
increase the number of nodes, use
repeaters.
*1 The unit may have a built-in transceiver.
Refer to the instruction manual for the unit.
*2 12 V power supply is required for each transceiver.
Ethernet
unit
*1
Vue de la page 232
1 2 ... 228 229 230 231 232 233 234 235 236 237 238 ... 331 332

Commentaires sur ces manuels

Pas de commentaire